by bbf501 » Fri Aug 29, 2008 10:52 pm
If you've installed a JD Jetting kit and done the o-ring upgrade you know how tough getting the o-ring in position can be. I really struggled with it on my bike. We did my buddy's tonight and I looped a section of fishing line through the o-ring before I installed it. I used a pair of needle nose plyers and a screw driver to slide the o-ring over the adjusting screw. When I had it all the way on I used a piece of bailing wire, looped through the fishing line to thread the line out by the upper shock. I then pulled the o-ring into place. After some further positioning of the o-ring I cut the line and slipped it out. Rather than spending an hour messing with this it took about 5 minutes. Totally different ball game. I know this wasn't the most technical description but hopefully it will help someone.